ESC

Click the "allow" button if you want to receive important news and updates from immigrationboards.com


Immigrationboards.com: Immigration, work visa and work permit discussion board

Welcome to immigrationboards.com!

Login Register Do not show

ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Only for queries regarding Indefinite Leave to Remain (ILR). Please use the EU Settlement Scheme forum for queries about settled status under Appendix EU

Moderators: Casa, John, ChetanOjha, archigabe, CR001, push, JAJ, ca.funke, Amber, zimba, vinny, Obie, EUsmileWEallsmile, batleykhan, meself2, geriatrix

p3orion
Newly Registered
Posts: 7
Joined: Tue Jan 08, 2019 12:22 pm
Japan

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by p3orion » Wed Mar 20, 2019 4:51 pm

p3orion wrote:
Tue Jan 08, 2019 12:35 pm
Applied for ILR Route : SET(O) Rep of Overseas Business w/ 3 dependents
Date application sent : 17/09/2018 (POST) - Standard service, as premium service was not available for Sole Rep
Document received by HO : 18/09/2018
Payment Debited : 20/09/2018
Biometric Letter received : 09/10/2018
Date Biometrics Enrolled : 13/10/2018
Approval/Refusal Received : waiting
BRP Card Received : waiting
More than 6 months has passed but no responses from them. (Never received a status update email either.)

Contacted HO and complained (through solicitor) : 20/3/2019
(HO staff on the phone said the case will be escalated and we should hear from them within 5 working days.)

Since there is no guarantee that HO returns my passport and BRP this week, now I have to cancel my business travel that has been scheduled next week. This affects the business significantly. :x

p3orion
Newly Registered
Posts: 7
Joined: Tue Jan 08, 2019 12:22 pm
Japan

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by p3orion » Thu Mar 21, 2019 4:14 pm

p3orion wrote:
Wed Mar 20, 2019 4:51 pm
p3orion wrote:
Tue Jan 08, 2019 12:35 pm
Applied for ILR Route : SET(O) Rep of Overseas Business w/ 3 dependents
Date application sent : 17/09/2018 (POST) - Standard service, as premium service was not available for Sole Rep
Document received by HO : 18/09/2018
Payment Debited : 20/09/2018
Biometric Letter received : 09/10/2018
Date Biometrics Enrolled : 13/10/2018
More than 6 months has passed but no responses from them. (Never received a status update email either.)

Contacted HO and complained (through solicitor) : 20/3/2019
(HO staff on the phone said the case will be escalated and we should hear from them within 5 working days.)

Since there is no guarantee that HO returns my passport and BRP this week, now I have to cancel my business travel that has been scheduled next week. This affects the business significantly. :x
UPDATE

Just received approval right after our solicitor made a contact to HO and asked them to escalate my case.

Approval Received: 21/03/2019
Passports and supporting documents returned: 21/03/2019
BRP Card Received : Waiting

APM919
Newly Registered
Posts: 2
Joined: Mon Mar 25, 2019 12:19 pm
United States of America

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by APM919 » Mon Mar 25, 2019 12:23 pm

Applied for ILR Route : SET (0) Sole Representative plus one dependent.
Date application sent : 24-Dec-2018 (online)
Document received by HO : 15-Jan-2019
Ack letter received (if applicable) : 24 Jan 2018 (email acknowledgement)
Biometric Letter received : Electronic letter 27/12/2018
Payment Debited : 24-Dec-2018
Date Biometrics Enrolled : 27/12/2018
Approval/Refusal Received : Waiting
BRP Card Received : Waiting
Waiting for 3 months so far...

youzidejia
Newly Registered
Posts: 13
Joined: Wed May 10, 2017 4:59 pm

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by youzidejia » Mon Mar 25, 2019 9:47 pm

Applied for ILR Route : SET(O) -PBS dependant 5 years route under T1 (plus 1 child)
Date application sent: 15/03/2019 Online
service: super priority fees : 3018*2
UKVCAS appointment: Croydon 25/03/2015 11:30am
Email received approval: 25/03/2019 14:58pm
Payment Debited : 18/03/2019
BRP Card Received : waiting

I uploaded all documents before attending the appointment. Arrived at the Croydon centre 11:20, left around 12:20. Received the grant email almost 2 and half hours later. Very impressed
Thank you all very much and wish you all the best

Junaidrai
Junior Member
Posts: 90
Joined: Wed Jun 17, 2015 12:53 pm

Tier 2 Gen. ILR - Super Priority Service - SET(O)

Post by Junaidrai » Wed Mar 27, 2019 11:32 am

Hi All,

Below is the timeline of my Tier 2 Gen. ILR application

Online Application - 07/03/2019
Documents submission - 08/03/2019 @Premium Lounge London @9:30am
Email received from the Visa Officer - 08/03/2019 @4:30pm (this was about Dependents who were present on the previous application of grant of leave as tier 2 gen.)
Responded to the email - 08/03/2019 @ 4:40pm

Then UKVI went on silent mode as I have seen for other members

13/03/2019
Contacted UKVI and tried to escalate, Adviser on the phone mentioned, that wait till Friday (i.e. 15/03/2019) and if you dont see anything in the post then come back to us an we will escalate this. Because, not all case workers send the email, some of them only send the letter.

20/03/2019
I waited longer than suggested and then on Wednesday contacted UKVI again, this time lady over the phone took my details and escalated the case for me.

21/03/2019
received a very generic email for UKVI contact center acknowledging the escalation (automated email)

21/03/2019
Around mid day, my status on the Prove your work site got changed (You have no limit on how long yo can stay in UK)

23/03/2019
Did receive the approval letter from UKVI

BRP Received - 27/03/2018 @ 10:30am

sharry_cherry
Newly Registered
Posts: 9
Joined: Sat Jan 21, 2017 1:13 am

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by sharry_cherry » Wed Mar 27, 2019 11:51 am

sharry_cherry wrote:
Tue Jan 08, 2019 11:03 am
Applied for ILR Route : set O tier 1 entp
Date application sent : 20th October 2018
Document received by HO :23th October 2018
Ack letter received (if applicable) : 20th December 2018
Biometric Letter received :02.11.2018
Date Biometrics Enrolled :02.11.2018
Payment Debited :24th October 2018
Approval/Refusal Received :waiting
BRP Card Received :waiting

On 22th march 2019 i contacted HO to expedite case they said we will take decision on weekend, but i didn’t receive anything till tomorrow so contact them again they said we have sent your passport and gave me tracking number. Today i have received passport waiting for BRP.

Thank you everyone
Best of luck those are waiting for decision.

User avatar
CR001
Moderator
Posts: 88120
Joined: Thu Mar 08, 2012 10:55 pm
Location: London
Mood:
South Africa

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by CR001 » Wed Mar 27, 2019 12:23 pm

@ GMO - PLEASE respect that this is a TIMELINE THREAD ONLY. Any question, chit chat or discussion posts have been and will continue to be removed.
Char (CR001 not Casa)
In life you cannot press the Backspace button!!
Please DO NOT send me a PM for immigration advice. I reserve the right to ignore the PM and not respond.

User avatar
GMO
Senior Member
Posts: 527
Joined: Wed Jul 13, 2016 1:29 am
Mood:
United Kingdom

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by GMO » Wed Mar 27, 2019 1:05 pm

Applied for ILR Route: 4 Oct 2018 ( PSC center but deferred to the postal timeline)
Ack letter received (if applicable) : Further investigation letter handed on the same day.
HO visit to work: 1 month prior to the application, September 2018
Co license suspended: 5th Oct 2018
Co sent Representation: 29 Oct 2018
Co license revoked: 6th December 2018
PAP sent by Co: 10th February 2019
Co License Reinstate: 5th March 2019
Approval/Refusal Received with passport and Doc: 27th March 2019
BRP Card Received: Waiting...

Alhamdulillah..finally the long journey comes to an end with a Good result. Thank you to the Forum for your immense support. It's stressful and needs lots of patience, prayer, and faith. You will be fine at the end if your papers are in line.

All the very Best wishes everyone. Hope everyone will get their positive result soon.

Itengineer2004
Newly Registered
Posts: 5
Joined: Mon Mar 25, 2019 11:47 am
United Kingdom

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by Itengineer2004 » Wed Mar 27, 2019 1:13 pm

Applied for my Wife's ILR

Applied for ILR Route : SET (O) Dependent - Super Priority Service - £3018.20
Date application sent : 10/03/19
Payment Debited : 10/03/19
Document received by HO : Uploaded online 23/03/19
Ack letter received (if applicable) : N/A
Bio-metric Letter received : N/A
Date Bio-metrics Enrolled : 23/03/19
Approval/Refusal Received : Awaiting
BRP Card Received : Awaiting

Not sure why they have not updated on the decision yet. Paid extra so that We could receive update quickly, but it seems it was money wasted.

Via123
Newly Registered
Posts: 11
Joined: Thu Feb 21, 2019 10:49 pm
United Kingdom

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by Via123 » Wed Mar 27, 2019 1:24 pm

Application type: Set (O) Tier 2, 5 year route

Online application submitted 25.3.19
Acknowledgement email 25.3.19
Fees paid 25.3.19 (Super priority)
Biometric enrolment 27.3.19 (9:00 am)
Online documents recieved by H O 27.3.19 (9:00 am)
Decision email: 27.3.19 (11:20 am) approved

Still surprised at the promptness but over the moon with the decision. I wish the very best of luck to all!

sailes
Newly Registered
Posts: 3
Joined: Tue Jan 22, 2019 1:56 pm
United Kingdom

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by sailes » Wed Mar 27, 2019 3:17 pm

Applied for ILR Route : Set (O) Tier 2, 5 year route (at ukvcas centre with Super Priority Service)
Date application sent : 19 Feb 2019 (Submitted Online with Biometric at ukvcas centre)
Document received by HO : (Form submitted online so nothing received except form submission confirmation)
Ack letter received (if applicable) : (Form submitted online so nothing received)
Biometric Letter received : 08 March 2019 10:00 (Submitted at ukvcas centre)
Date Biometrics Enrolled : 08 March 2019 10:00 (Submitted at ukvcas centre)
Payment Debited : 19 Feb 2019
Approval/Refusal Received : 11 Mar 2019 at 10:23 (Approval Email Confirmation, took 2 extra days because of Saturday & Sunday)
BRP Card Received :14 Mar 2019

umarahm3d
Newly Registered
Posts: 14
Joined: Tue Aug 16, 2016 2:33 pm

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by umarahm3d » Thu Mar 28, 2019 11:19 am

Super Priority Service

Applied for ILR Route : Tier 2 General
Date application sent : 12:30, 27/03/2019 (once the bio metric is done at UKVCAS)
Document received by HO : uploaded on UKVCAS portal myself
Ack letter received (if applicable) : no acknowledgement letter, received an email on the same day of submission regarding the dependent which was on previous Tier 2 application but was not on ILR application, email received 16:30 on 27/03/2019 replied back 16:45 on 27/03/2019
Biometric Letter received : N/A
Date Biometrics Enrolled : 27/03/2019
Payment Debited : 15/03/2019
Approval/Refusal Received : received the approval email at 10:02 on 28/03/2019
BRP Card Received : Pending

Overall very smooth experience, impressed with the service. Thanks to this forum been really helpful.

User avatar
CR001
Moderator
Posts: 88120
Joined: Thu Mar 08, 2012 10:55 pm
Location: London
Mood:
South Africa

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by CR001 » Thu Mar 28, 2019 4:19 pm

@ VWS - PLEASE respect that this is a TIMELINE THREAD ONLY. Any question, chit chat or discussion posts have been and will continue to be removed.
Char (CR001 not Casa)
In life you cannot press the Backspace button!!
Please DO NOT send me a PM for immigration advice. I reserve the right to ignore the PM and not respond.

MubaZaara
Newly Registered
Posts: 11
Joined: Fri Mar 29, 2019 11:58 am
India

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by MubaZaara » Fri Mar 29, 2019 12:08 pm

Applied for ILR Route : Tier 2 General(super priority)
Date application sent : 19/03/2019
Document received by HO : uploaded on UKVCAS portal
Ack letter received (if applicable) : no acknowledgement letter:no
Biometric Letter received : N/A
Date Biometrics Enrolled : 28/03/2019,10:00 am
Payment Debited : 19/03/2019
Approval/Refusal Received : Pending
BRP Card Received : Pending

User avatar
CR001
Moderator
Posts: 88120
Joined: Thu Mar 08, 2012 10:55 pm
Location: London
Mood:
South Africa

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by CR001 » Fri Mar 29, 2019 9:48 pm

@ Suman100 - PLEASE respect that this is a TIMELINE THREAD ONLY. Any question, chit chat or discussion posts have been and will continue to be removed.
Char (CR001 not Casa)
In life you cannot press the Backspace button!!
Please DO NOT send me a PM for immigration advice. I reserve the right to ignore the PM and not respond.

sumairc
Junior Member
Posts: 57
Joined: Fri Sep 13, 2013 3:30 pm
United Kingdom

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by sumairc » Sat Mar 30, 2019 1:03 pm

Applied for ILR Route : 5 Year Spouse (Applied 28 Days before the 5 year anniversary)
Service: Super Priority Service
Date of Online Application : 18 March 2019
UKVCAS Appointment & Submission: 26th March 2019, 11:30am
ILR Approval Email: 27th March 2019 8:30am
ILR BRP Card Received: 29th March 2019

bramhy
Newly Registered
Posts: 17
Joined: Wed Sep 26, 2012 12:28 pm
United Kingdom

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by bramhy » Sun Mar 31, 2019 12:12 pm

Applied for ILR Route : Set (O) Tier 2 Dependent visa
Date application sent : 21 Jan 2019 (Submitted Online with Biometric at ukvcas centre)
Ack letter received (if applicable) : Automated email for payment confirmation only. No case id or acknowledgement received.
Date Biometrics Enrolled : 03 Feb 2019 (Submitted at ukvcas centre)
Approval/Refusal Received : 30 Mar 2019. Approval dated 26 Mar 2019
BRP Card Received : waiting

Approx 9 weeks for dependent ILR by normal service. Very Happy :D

User avatar
sacbmth
Newbie
Posts: 40
Joined: Thu Feb 07, 2019 10:04 pm
Brazil

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by sacbmth » Sun Mar 31, 2019 12:22 pm

I just received an email saying my ILR set(o) has been granted! Didn't expect a response on a Sunday though but chuffed to bits! Email was very generic and no mention of my name anywhere on the email.

Here's my timeline...

Application submitted and documents uploaded - 19/03/2019
Biometrics enrolled - 29/03/2019
Decision email received - 31/03/2019

MubaZaara
Newly Registered
Posts: 11
Joined: Fri Mar 29, 2019 11:58 am
India

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by MubaZaara » Sun Mar 31, 2019 12:39 pm

MubaZaara wrote:
Fri Mar 29, 2019 12:08 pm
Applied for ILR Route : Tier 2 General(super priority)
Date application sent : 19/03/2019
Document received by HO : uploaded on UKVCAS portal
Ack letter received (if applicable) : no acknowledgement letter:no
Biometric Letter received : N/A
Date Biometrics Enrolled : 28/03/2019,10:00 am
Payment Debited : 19/03/2019
Approval/Refusal Received : Approval mail 31/03/19
BRP Card Received : Pending

MubaZaara
Newly Registered
Posts: 11
Joined: Fri Mar 29, 2019 11:58 am
India

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by MubaZaara » Sun Mar 31, 2019 12:40 pm

MubaZaara wrote:
Sun Mar 31, 2019 12:39 pm
MubaZaara wrote:
Fri Mar 29, 2019 12:08 pm
Applied for ILR Route : Tier 2 General(super priority)
Date application sent : 19/03/2019
Document received by HO : uploaded on UKVCAS portal
Ack letter received (if applicable) : no acknowledgement letter:no
Biometric Letter received : N/A
Date Biometrics Enrolled : 28/03/2019,10:00 am
Payment Debited : 19/03/2019
Approval/Refusal Received : Approval mail 31/03/19
BRP Card Received : Pending

MateenS
Newly Registered
Posts: 11
Joined: Fri Mar 29, 2019 12:06 pm
India

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by MateenS » Sun Mar 31, 2019 5:38 pm

Hi,

Just wanted to say thank you to everyone especially CR001, this site has been a great help.

I applied through super priority for ILR.
Eligibility period calculated from the date of receiving the first VISA/Leave to remain. Although there was a gap of 40 days before entering the UK.

Submitted Biometric on Monday 25th March (11:30 - took 25 min once called in)
Received email of acceptance next day -26th March (9:30)
Received ILR in post on 28th March (11:00)

All the best.

amirdragon0
Newly Registered
Posts: 9
Joined: Tue Sep 20, 2011 4:31 pm
Mood:
Contact:
Iran

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by amirdragon0 » Mon Apr 01, 2019 9:33 am

Applied for ILR Route : SET(O)
Date application submitted (online) : 28/11/2018
Ack Email received (if applicable) : 28/11/2018
Document received by HO : 4/12/2018
Date Biometrics Enrolled : 29/11/2018
Payment Debited : 28/11/2018
Approval/Refusal Received : still waiting...! :shock: :shock:
BRP Card Received : still waiting...! :roll: :roll:

Goose55
Newly Registered
Posts: 20
Joined: Wed May 01, 2013 4:58 pm
United Kingdom

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by Goose55 » Mon Apr 01, 2019 1:59 pm

Applied for ILR Route : SET(M)
Date application submitted (online) : 03/11/2018
Ack Email received (if applicable) : 03/11/2018
Document received by HO : 04/11/2018
Date Biometrics Enrolled : 27/11/2018
Payment Debited : 27/11/2018
Approval/Refusal Received : still waiting
BRP Card Received : still waiting

Been 5 months now. Why are they so slow?

raaji
Junior Member
Posts: 69
Joined: Mon Dec 20, 2010 8:46 pm

Re: ILR TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by raaji » Mon Apr 01, 2019 2:00 pm

Applied for ILR Route : Set (O) Tier 1 dependant (at ukvcas centre with Super Priority Service)
Date application sent : 01 mar 2019 (Submitted Online with Biometric at ukvcas centre)
Document received by HO : (Form submitted online so nothing received except form submission confirmation)
Ack letter received (if applicable) : (Form submitted online so nothing received)

Date Biometrics Enrolled : 29 March 2019 10:30 (Submitted at ukvcas centre)
Payment Debited : 01 mar 2019
Approval/Refusal Received : still waiting
BRP Card Received :still waiting

strange to charge extra money but no reply . just stright forward application..

hello1717
Newly Registered
Posts: 4
Joined: Fri Dec 07, 2018 3:39 pm
India

Re: ILR Postal TIMELINES- SET(O) SET(F) SET(M) (not Set(LR) PLS)

Post by hello1717 » Mon Apr 01, 2019 2:24 pm

hello1717 wrote:
Fri Dec 07, 2018 3:43 pm
Applied for ILR Route : Set O Tier 1 Entrepreneur Accelerated 3 years - Sopra Steria
Date application sent : 19 November 2018 (online)
Ack letter received : Email 19 November
Document received by HO : 27 November 2018 – Self Uploaded Online
Date Biometrics Enrolled: 29 November 2018 – Via Sopra Steria
Payment Debited : 20 November 2018
Approval/Refusal Received :pending
BRP Card Received :pending
Still waiting. 4 months crossed only getting acknowledgement email every month around the 20th.